The contract is signed and the machine is nearly ready to pack — and this is the point where many buyers discover that nobody defined what “accepted” actually means. A factory acceptance test (FAT) closes that gap, and a written factory acceptance test checklist is what turns the visit from a factory tour into a pass/fail decision you can enforce.

We build the acceptance evidence before any buyer books a trip. Every production batch goes through four factory test stations before packing: water-tightness and spray-pressure calibration on the wet side, drying temperature uniformity across the chamber, a 72-hour continuous trial run (a factory-floor test on the machine itself, not a substitute for testing on your own boards), and an ionic cleanliness verification on a standard test board. (Source: CHUANGQI factory acceptance process, about page, accessed 16 November 2026.) This article shows what those stations already prove, the eight clauses worth writing into the contract, and the line a factory test cannot cross.

Key takeaways

What the four factory test stations already cover

Before you draft a single clause, it helps to know which questions are already answered at the factory. The four stations split cleanly between “the machine is built right” and “your process will behave”:

Factory test stationWhat it verifiesWhat it does not verify
Water-tightness and spray-pressure calibrationThe wet loop holds pressure; nozzles deliver as calibratedHow your flux chemistry responds to the spray
Drying temperature uniformityHeat distributes evenly across the drying sectionDry-out inside the low-clearance zones of your specific board stack-up
72-hour continuous trial runThe complete loop stays stable over sustained operationYour production mix over months of two-shift running
Ionic cleanliness verification on a test boardThe wash reaches a defined cleanliness level on a reference panelYour customer’s spec applied to your real assemblies

(Source: CHUANGQI factory acceptance process, about page, accessed 16 November 2026.)

Technician checking fluid line connections on an industrial cleaning machine
Wet-loop plumbing check — part of the pre-packing condition

8 clauses to put in the FAT checklist

The checklist below is written so it can be pasted into a purchase contract almost verbatim. Each clause states what to define and why it earns its place:

  1. Scope and release gate. Name the four stations that must pass before the machine is released for packing. Without this, “tested at the factory” can mean anything from a power-on check to a full qualification.
  2. Test conditions per station. State which test board type, which cleaning medium, and which acceptance method apply. A cleanliness result without its conditions is a number nobody can reproduce.
  3. Witnessing method. Declare whether you attend in person, follow by video, or accept recorded evidence. State this per station — watching the trial run in real time is worth more than watching the packing.
  4. Documentation package. List the records you expect: spray-pressure calibration data, the temperature-distribution result from the drying test, the trial-run log, and the ionic cleanliness result on the test board. If your own quality system needs per-batch release records after installation, define that format now — the same logic carries over (cleaning verification and release records).
  5. Deviation handling. Define what happens when one station fails: retest scope, repair responsibility, and who signs the retest report. A failed station handled ad hoc on the visit day is a frequent source of disputed acceptance.
  6. Pre-packing condition. Specify that the wet loop is drained and dried, fixtures are secured, and the control cabinet is protected, so the machine that passed the FAT is the machine that arrives.
  7. Delivery content check. List what ships with the machine — manuals, seals, filters, fixtures — and match it against the spares list you agreed. Checking this at the factory costs minutes; checking it after customs can cost weeks of schedule.
  8. Sign-off authority. Name who signs, on which document, and what that signature releases: the FAT report closes, packing is authorized, and the shipment clock starts.

What a factory test cannot prove

A FAT runs on reference panels and calibrated conditions. It is not suitable for proving three things that decide your real outcome:

The direct way to close that gap is to send your own boards through the machine before you commit. The sample test runs on the machine type matched to your application and returns three things: the wash filmed before and after, a written cleaning report, and a recommended machine type (how a sample cleaning test works). The test costs nothing and commits you to nothing — every sample-test request gets an answer inside 24 hours, and courier arrangements are confirmed with you before you send the samples (Source: CHUANGQI free-test page, accessed 16 November 2026). If your project starts from a line layout rather than a single machine, the installation checklist picks up where the FAT ends.

Ready to define the acceptance scope for your machine? Send your requirements and receive a quote within 24 hours.

FAQ

Is a factory acceptance test the same as a site acceptance test?

No. The FAT happens at the manufacturer before packing and proves the built machine against the checklist. The site acceptance test (SAT) happens after installation and proves the machine inside your facility — your utilities, your boards, your operators. The FAT checklist above is the input the SAT builds on.

Can I witness the factory test remotely?

Many buyers do — which is why the checklist asks you to declare the witnessing method per station in clause 3: attend in person, follow by video, or accept recorded evidence. Whichever you choose, request the recordings afterward so the evidence stays in your file as well as the factory’s.

Does the factory test prove my boards will come out clean?

No. It proves the machine reaches a defined cleanliness level on a reference board. It does not cover your chemistry, your tightest component gaps, or the limit your own customer sets — that is what a sample test on your actual boards is for.

What documents should the FAT package include?

At minimum: the spray-pressure calibration record, the drying temperature-distribution result, the 72-hour trial-run log, and the ionic cleanliness result on the test board, plus the signed FAT report. Clause 4 of the checklist exists so this list is agreed before the test, not negotiated after it.

About the author

Anne is an Application Engineer at CHUANGQI. She works with EMS and OEM manufacturers on cleaning-process questions: analysing flux and residue findings, sizing the right machine configuration (inline or batch, stencil, nozzle or dry ice), and supporting remote commissioning, acceptance testing and process documentation.