A tender document does not ask whether your PCB cleaning machine is good. It asks eight questions that have to be answered with numbers, and the specification sheet in your bid pack answers some of them and leaves the rest blank. The fix is a coverage matrix: mark each tender line as quoted, derived from a stated assumption, or answered with a process record.
Two cleaning-equipment notices registered on 12 and 13 November 2026 close on 3 and 4 December, covering 10 machines across three production lines (Source: ebnew.com tender registrations, November 2026). We ran the eight line items such notices hinge on against the three inline platforms in the CHUANGQI catalogue: the CQ-C9610 aqueous inline washer, the CQ-C753 substrate brush cleaner and the CQ-C7320 dry-ice inline system. Three lines appear on all three datasheets. Three appear on some of them. Two appear on none.
Key takeaways
- A public tender asks eight spec lines that a datasheet answers only partly.
- Installed power, footprint and weight appear on all three inline datasheets.
- Noise appears on one of three; acceptance evidence and hourly output on none.
- Mark each tender line quoted, derived or process-backed before the bid closes.
Eight lines a tender fixes before it fixes a price
This audit reads published specification tables for three inline platforms on 20 November 2026 and matches field names against eight line items that recur in public cleaning-equipment notices. It reads field names, not brochure sentences, and it does not read any complete tender text. The counts describe what a datasheet states, not what a machine can do.
A tender has to let every bidder price the same scope, so the technical annex pins eight variables before anyone opens the commercial envelope:
- Workpiece envelope — the largest board or pallet that fits, plus the height clearance above it.
- Transport rate — conveyor speed or feed rate, in the unit the buyer will run.
- Installed power — voltage, phase and connected load.
- Footprint and weight — floor area and transport weight.
- Compressed air — pressure band and flow.
- Noise — sound pressure where the operator stands.
- Acceptance evidence — the test method and the record that proves it.
- Output per hour — boards per hour at a stated pitch.
This is where bid packs stall. One line in a typical annex asks for cleaning capacity in boards per hour. The datasheet answers the transport question in millimetres per minute, because that is the variable the machine actually sets at the panel. Both statements are true, and neither one is the figure the evaluation committee has to score. The bidder who converts without saying so hands the committee a number nobody can defend; the bidder who states the pitch and shows the arithmetic hands over something checkable.
Where the datasheets answer, and where they go silent
| Tender line | Datasheet field that answers it | Platforms publishing it (of 3) |
|---|---|---|
| Workpiece envelope | Max workpiece size / PCB size range | 2 |
| Transport rate | Conveyor speed or pellet feed rate | 2 |
| Installed power | Power supply plus connected load | 3 |
| Footprint and weight | Machine dimensions and weight | 3 |
| Compressed air | Pressure band and air flow | 2 |
| Noise | Sound pressure level | 1 |
| Acceptance evidence | None published | 0 |
| Output per hour | None published | 0 |
Source: CHUANGQI datasheet audit, 20 November 2026 — specification tables for the CQ-C9610, the CQ-C753 and the CQ-C7320. Counts are field-name matches; they are not performance claims and they do not compare machine quality.
The shape of that table matters more than the split. Every platform publishes what a plant engineer needs before delivery date: power, floor space, weight. Fewer publish what a safety or environmental reviewer asks for. Only the dry-ice unit states an ingress rating, and only the aqueous washer states a sound pressure figure. That pattern is not carelessness. It follows what each page is written for — installation planning — rather than what a tender evaluation scores.
The two zeros are structural. Acceptance is not a property of a machine, so it does not belong in a specification row: the CQ-C9610 is inspected batch by batch at the factory, with four documented stages: a 72-hour continuous run, water tightness and spray-pressure calibration, ion cleanliness measured on test boards, and drying temperature uniformity. Hourly output is not a property either. It falls out of conveyor speed and the board pitch you choose, which is why no datasheet can state it honestly without your product data.
What to write when the datasheet is silent
Three responses keep a bid defensible, and all three are cheaper than a clarification round:
- Quote the field and keep its unit. Give the published value with the field name that carries it. If you convert, say what you converted and why; an unexplained figure invites a challenge you will spend a week answering.
- State the assumption, then the arithmetic. For output per hour, name the board length and the gap you will run, show how the conveyor setting turns into boards per hour, and mark the result as calculated. A committee can audit a stated method. It cannot audit a round number.
- Attach a process record where the annex wants proof. Batch inspection records answer the acceptance line for the machines you build; a sample run answers it for the buyer’s own boards.
The sample route is the one buyers ask for when the acceptance clause is still open at bid stage. Contaminated panels go to the factory, are cleaned on the machine type that matches the application, and come back documented. The test itself is free of charge, there is no obligation to buy, each request is answered within 24 hours, and the return package is a before/after video, a cleaning report and a process recommendation with the suggested machine type. Courier arrangements are confirmed individually before you send.
None of this replaces the annex. It fills the lines the annex leaves to the bidder, using records you already hold instead of estimates you would have to defend.
Limits of this audit
- The count measures published field names, not machine performance, cleanliness or throughput.
- Three inline platforms are not the market. Another supplier’s datasheet may answer more of these lines, or fewer.
- Public notices differ by buyer, country and sector. The clauses in your document govern, not the pattern described here.
- Dry-ice blasting and substrate brushing are different processes from aqueous flux removal, so line-item relevance shifts between the three platforms.
For the field-by-field comparison a buyer runs between two shortlisted machines, the twelve-field sheet in how to compare PCB cleaning machine specs line by line covers that step; this page stops at what a tender requires from a single bid.
What should a PCB cleaning machine datasheet include for a tender?
At minimum, the six lines a plant needs before delivery: workpiece envelope, transport rate, installed power, footprint and weight, compressed air, and noise. The two lines an evaluation committee scores hardest — acceptance evidence and hourly output — usually sit outside the specification table, so plan to answer them separately.
Can you quote output per hour from a datasheet?
Not directly, and none of the three inline platforms publishes it. Output per hour depends on conveyor speed and the pitch between boards, so the number belongs in the bid response with its assumption stated, not in a specification row.
Is a factory acceptance test enough as tender evidence?
It answers the acceptance line for the machine you are buying, because each production batch is inspected before shipment. If the annex also asks for evidence on the buyer’s own boards, a sample run supplies it. Neither route substitutes for the buyer’s own acceptance criterion.
Does this apply to dry-ice or stencil cleaning equipment?
Partly. The dry-ice platform publishes a feed rate and an ingress rating but no board envelope, so tenders written for aqueous lines do not map onto it cleanly. Stencil cleaning is a separate platform with its own annex wording. Comparing an inline washer against a batch machine first is a different decision, covered in inline versus offline PCBA cleaning machines.
Next step: send the cleaning line items from your tender document, plus one board drawing. We answer each line against the CQ-C9610 inline PCBA water cleaning machine specification, flag the lines that need a process record instead of a number, then come back with a quote within 24 hours. Send us the line items.